Client
Ray Group
Location
Charlton, QLD
Specifications
- 11,511m2 site area
- 790m2 multi tenancy retail space
- 384m2 fuel canopy
- 225m2 truck fuel canopy
- 200m3 detention basin
Project Highlights
- Part of the Super Electric Highway network
- Car and truck fuel canopies with access for B-triple
- 12m pylon sign
- Challenging site location without town water or sewer connection